PROJECT
 Upgrading of Existing 132kV Transmission Line PMU Kg. Awah to PMU Jengka From Single 
Circuit to Double Circuit
Proposed 132kV Double Circuit Looping In/Out Into Bentong South Substation From Existing 132kV
Kg. Awah/ Karak -Bentong/ Avetani Transmission Line - Package 2
Mainhead A: Double Circuit 500kV Transmission Line From 500/275kV Yong Peng
East Substation To Point 'A' (Mukim Jabi, Daerah Segamat)
ID
TNB 77/2015
TNB 182/2015
TNB 209/2015
CLIENT
TENAGA NASIONAL BERHAD
TENAGA NASIONAL BERHAD
TENAGA NASIONAL BERHAD
RM (Mil)
20.14
13.2
132.1
YEAR
2015-2017
2015-2017
2015-2018