About

P.E.S.B. ENGINEERING SDN. BHD. Company No. 10933-M
P.E.S.B. Engineering Sdn Bhd (PESB) was established in July 1971 with an authorized capital of RM30.0 Million and a paid-up capital RM21.0 Million. The company was established as a wholly owned subsidiary of Perbadanan Nasional Berhad (PERNAS) in 1969, arising from the New Economic Policy’s objective of increasing the participation, investment and employment opportunities for Bumiputera in the industrial sectors.
From 1971 to date, PESB established various Joint-Ventures in various field such as the assembly of Telecommunication equipment, switching exchanges, multiplexer, manufacturing material handling equipment, the operation of a fully integrated steel mill, overhead transmission line, underground cable, and substation. PESB was set up to spearhead industrial development through the JV with Multi-national corporations and foreign parties to develop Bumiputera skills, technology and expertise in manufacturing and engineering related to Pernas Group. In 1998, the equity of PESB was transferred to the current directors through the Management Buy Out exercise.
For more than 30 years, PESB has ventured into engineering construction in specialized services mainly in the Electrical Works, Mechanical and Electrical Installations with our
highly skilled professionals.
Financially our current net worth is over RM75.0 million and is expected to increase to over RM100.0 million for the financial year ending 2023. We have banking facilities of over RM100.0 million from a couple of reputable Bank institutions in Malaysia. Based on this financial consideration, PESB is capable of undertaking RM1.0 billion worth of projects.
We initiated our own Development Scheme in the transmission lines and substation projects and have developed companies in clearing works, survey, soil investigation
works, foundation works, tower erection works, stringing works and substation works. PESB has established JV’s with Companies for its present and future Malaysian operations.
To date PESB has successfully
  • Completed the construction of over 60 km of 500kV, 1,000 km of 275kV and 132kV overhead transmission lines.
  • Completed the 275kV Brickfields Extension Substation, the 132kV Kota Masai Substation, the 132kV Cochrane and PMU 132kV Cyberjaya Substation.
  • Completed RM210.0 million of contracts for Sabah Electricity Sdn Bhd for the construction of sub stations, transformers, underground cable, supply and delivery of 48 Digital Communication Equipment and 240 AC for the SCADA System in various parts of Sabah.
  • Completed the 132kV Elopura Substation, 132kV Underground Cable in Sabah valued at RM100.0 million in 2018 and the 275kV Mangalong Substation at RM115.0 million.
  • In Sarawak we have successfully completed the Mendu 132kV Substation valued at RM50.0 million in 2018 and PMU Sg Merah Sg Maaw worth at RM53.0 million.

Board Of Director

Mustafa Bin Mohd Junit

Muhammad Affandi Bin Mustafa

Nurlaili Binti Mustafa

Roslan Bin Mat Juri

Norazizah Binti Abd Aziz

Top Management

Mustafa Mohd Junit

Chief Executive Officer

Muhammad Affandi Mustafa

Chief Operation Officer

Roslan Mat Juri

General Manager Project & Engineering

Nurlaili Mustafa

Manager